105,000-Liter GRP Modular Water Tank for a Commercial Laundry, Taguig

Supply, delivery and installation of a 14 m long GRP panel tank on reinforced concrete plinth beams in an operating laundry facility's yard. Assembled on site without a crane. Completed July 2026.

105,000 L
Tank capacity
GRP modular panel
Tank type
Taguig City
Location
July 2026
Completed
Completed 105,000-liter GRP modular water tank on reinforced concrete plinth beams at a commercial laundry in Taguig

The Client

A commercial laundry operating a processing facility in Taguig City, Metro Manila. Laundry is water-hungry work: wash cycles stop when supply drops, so the facility needed a large reserve of feed water on site.

Requirements and Constraints

  • About 100 cubic meters of storage for laundry feed water.
  • Panels suitable for potable and process water contact.
  • The tank had to fit a long, narrow strip of the facility's existing concrete yard, which set the footprint at 14 m by 2.5 m.
  • Installation on an operating site, with no crane access.

Why 14 m x 2.5 m x 3 m

The available space was long and narrow, so the tank was laid out to the space rather than the other way round. At 3 m high and 14 m long the tank holds 105 cubic meters, slightly above the 100 cubic meter target, in a single compartment.

The TankSmith Solution

Foundation

The tank sits on 15 reinforced concrete plinth beams at 1 m centers, each spanning the 2.5 m tank width. The beams were cast on the existing concrete yard, with the reinforcing bars drilled and epoxy-anchored into the slab, and levelled before assembly.

Panel Assembly

The panel kit arrived in two deliveries and was assembled on site, tier by tier, without a crane. About 187 GRP panels in total, with stepped panel thickness from 14 mm at the base to 7 mm at the top, where the water pressure is lowest. Internal hardware is SS304 stainless steel; external bracing, tie rods and ladder are hot-dip galvanized steel. EPDM sealing gaskets were fitted at every panel joint.

Crew fitting EPDM gaskets and bolts on GRP panels before assembly
GRP tank assembly in progress on site in Taguig, built tier by tier without a crane
Hot-dip galvanized tie rod joint on the outside of the GRP tank wall
Roof panels and manhole on top of the 105 m³ GRP tank

Connections

Four DN100 stainless steel flanged nozzles for inlet, outlet, overflow and drain.

Booster Pump Package

We also supplied the facility's pump package: a duplex booster pump set on a variable-speed (VFD) control panel, with a 1,000 L bladder tank, feeding the building from the tank.

Testing and Turnover

The tank was filled and hydrostatically tested, then turned over to the client with a witnessed sign-off, a certificate of completion and a certificate of warranty.

105 m³
Single-compartment storage
No crane
Assembled by hand on site
12 mo + 3 yr
Workmanship + product warranty

Key Project Details

ClientCommercial laundry, Taguig City
LocationTaguig City, Metro Manila
ApplicationLaundry process and feed water storage
Tank typeGRP modular bolted panel tank, WRAS-approved panels
Capacity105,000 liters (105 m³)
Dimensions14.0 m x 2.5 m x 3.0 m (L x W x H)
PanelsAbout 187, stepped 14 / 12 / 10 / 8 / 7 mm
HardwareSS304 internal, hot-dip galvanized external
Connections4 x DN100 SS304 flanged nozzles
Foundation15 RC plinth beams at 1 m centers, anchored to the existing slab
Pump systemDuplex booster set, VFD control panel, 1,000 L bladder tank
ScopeSupply, delivery, foundation beams, assembly, hydrostatic test, turnover
CompletedJuly 2026
Warranty12 months workmanship, 3 years product

Found this useful? Add TankSmith as a Preferred Source on Google so our tank sizing guides show up first next time you search.

Request a Quote

Ready to specify your system?

Send your tank capacity, application, and location. We reply within one business day with clarifying questions and a quotation timeline.