TankSmithTankSmith
FRP water tank replacement and expansion panel assembly
All Products
Product Specifications

Replacement & Expansion Panels

Individual panels: all tank types

Original-spec panels and field crews for repairing leaks, replacing corroded sections, or adding capacity to any brand of modular panel tank: without taking the system offline longer than necessary.

Request a Quote
Replacement & Expansion Panels: photo 1
Replacement & Expansion Panels: photo 2
Overview

Original panels for tank repair, capacity expansion, or color upgrade. Available in GRP fiberglass, hot-dip galvanized steel, and painted sprayed steel in multiple colors (red for fire reserve, black, custom RAL).

Applications
Tank repairCapacity expansionFire reserve (red panels)Color-coded storageRetrofit projects
Technical Specifications
GRP panels1000×1000 / 1000×500 mm: RAL 9002 cream / grey
HDG panels1250×1250 mm standard: Q235 + 80–120 µm zinc (Z275/G90)
Painted panelsSprayed steel: red (fire reserve), black, custom RAL
Use casesTank repair, capacity increase, color-coded fire reserve
CompatibilityAll TankSmith-supplied tank systems

All tanks WRAS-certified. Custom capacities and configurations available.

Inquire About This Product

Three reasons clients call us for panel work

  1. 01.A leak appeared at a panel joint or corner: the original installer is unreachable or out of business.
  2. 02.Corroded or algae-stained panels have reduced water quality and failed the latest health inspection.
  3. 03.The building added two floors and the existing tank can no longer meet peak demand: expansion is cheaper than full replacement.

We work on any brand of SMC / GRP / FRP / HDG panel tank, not just tanks we installed. If you have the original tank dimensions, we can match the panel spec.

What a panel replacement job covers

ScopeWhat we do
Leak investigationDrain, inspect joints, identify cracked or delaminated panels and failed gaskets.
Panel matchingMatch original panel dimensions (600 mm, 1 000 mm, or 1 200 mm module) and material grade.
Gasket replacementAll disturbed joints get new food-grade EPDM or NBR gaskets: never reused.
Bolt torque checkRetorque all stainless tie-rod nuts to spec; replace corroded fasteners.
Interior coating (HDG only)Touch-up epoxy coat on exposed bare steel where zinc has worn through.
Pressure testRefill and hold at operating head for 24 h before handing back.
DocumentationAs-built sketch, replaced-panel count, water quality test result: provided on request.

How a panel swap works: 8 steps

  1. 01.Site visit: measure current tank, photograph damage, confirm panel module size and material.
  2. 02.Quotation: itemized: panels, gaskets, fasteners, labor, crane hire if needed.
  3. 03.Panel fabrication: matched to original spec; standard lead is 5–7 working days for GRP/FRP, 3–5 days for HDG.
  4. 04.Scheduling: we coordinate drain-down with your building manager to minimise service interruption.
  5. 05.Drain and dewater: pump out to a safe level; confined-space entry procedures applied.
  6. 06.Panel removal and replacement: damaged panels out, new panels in, fresh gaskets on every disturbed joint.
  7. 07.Torque and seal check: visual inspection plus torque wrench on all fasteners.
  8. 08.Refill and test: 24-hour hold, water sample if requested, sign-off sheet provided.

Most single-wall panel replacements (1–4 panels) are completed in one working day. Full-wall replacements on large tanks (200 m³+) typically require two days. We schedule around your reserve tank or off-peak period.

Expanding an existing tank

Modular panel tanks are designed to grow. If your current tank is a standard module size, we can add a bay: effectively lengthening the footprint: or add a full second chamber running parallel and manifolded to the first.

Expansion requires confirming the existing base pad can carry the additional load, and that the inlet/outlet pipework can be re-routed. We assess this on the site visit and quote the civil works if needed.

If expansion is not feasible (site constraints, pad limitations), we will tell you clearly and quote a full replacement instead.

Tank brands we have serviced

  • Bestank (GRP and HDG panel tanks)
  • Sungil (SMC panel tanks)
  • Pipeco (FRP tanks)
  • AquaCube (GRP modular)
  • Unnamed or locally fabricated HDG tanks: as long as panel dimensions are determinable

Replacement panels carry the same 10-year material warranty as new installations. Labor warranty on the replaced section is 12 months from sign-off.

Replacement & Expansion: Frequently Asked Questions

Can you replace panels without fully draining the tank?

Partial drain-down is possible for single-panel repairs on the upper half of the tank. Full replacement of bottom or corner panels requires full drain. We advise which applies after the site visit.

How do I know if my tank needs panels or a full replacement?

If more than 30–40% of panels show delamination, heavy pitting, or structural cracking, a full replacement is usually more cost-effective than piecemeal repair. We give you an honest assessment with photos.

Do replacement panels match the original colour?

GRP/FRP panels are typically grey or off-white and match closely. HDG is zinc-coated silver regardless of age: some patina difference is normal. Colour is not a structural concern.

Is there a minimum job size?

We do single-panel replacements. Minimum quotation is one panel plus associated gaskets and fasteners. Mobilisation cost for a single panel in Metro Manila is typically ₱3,500–₱5,000.

Can you expand a tank that you did not originally install?

Yes, provided we can verify the existing panel module size and base pad capacity. A short site visit is required before we quote.

Pair it with

Replacement work is often triggered by a pump failure that caused the tank to run dry and overheat the panels. If your pump also needs attention, we can quote both together.

Start Your Project

Ready to Get
Your System Installed?

One team handles supply, installation, and commissioning: from first assessment to final handover.

Get a Quote

Ready to specify your system?

Send your tank capacity, application, and location. We reply within one business day with clarifying questions and a quotation timeline.