TankSmithTankSmith
Buying Guide · Philippines

What Is a 100 Liter Charge Tank With Legs and Gusset Weldment

A 100-liter charge tank with legs and gusset weldment is a small welded pressure vessel that buffers pump start-stop cycles in a booster system: legs lift it off the floor, gusset plates weld the legs to the shell for rigidity. TankSmith does not fabricate these vessels. TankSmith installs modular tanks (1,000 to 500,000 liters) paired with CDL/CDLF booster pumps and VFD duplex control, supply-to-commissioning in 5 to 14 days.

What a Charge Tank With Legs and Gusset Weldment Actually Is

A charge tank is a small pressurized or vented buffer vessel installed on the suction or discharge side of a water booster pump set. Legs are welded supports that lift the tank off the floor or a skid frame, and a gusset weldment is the triangular steel plate welded between each leg and the tank shell to stop the legs from flexing under the tank's weight and vibration. On a 100-liter charge tank, this weldment matters because the vessel is small enough to sit above floor level rather than resting on a saddle or cradle, so the legs and gussets carry the full load and absorb the shock of pump start-stop cycles. Buyers search this exact phrase because it appears verbatim on pump manufacturer cut sheets and fabrication drawings, not because "charge tank" alone is ambiguous. TankSmith does not fabricate 100-liter pressure vessels of this type: TankSmith's product range starts at 1,000 liters and is built as modular bolted panel tanks (FRP, GRP, hot-dip galvanized steel, or stainless steel 304/316), not single-piece welded steel vessels. If a project genuinely calls for a small welded charge tank at this exact size, that is a pressure-vessel fabrication job, not a modular tank system. What TankSmith can speak to is the booster pump and control side of the same system, and whether a charge tank is even the right approach once VFD control is in place.

Why 100 Liters Is a Common Spec on Booster Pump Cut Sheets

A 100-liter charge tank shows up often on booster pump specifications because it sits at a size that buffers a few seconds of flow, enough to stop a fixed-speed pump from cycling on and off every time a single faucet opens. Older constant-speed booster systems rely on this buffer tank to protect the pump motor from short-cycling, since starting a motor too frequently wears out motor windings and contactors faster than continuous running does. The 100-liter figure is a rule-of-thumb size for small to mid-size commercial buildings, not a fixed engineering constant, so actual sizing depends on pump flow rate, minimum run time, and the pressure switch differential set on the control panel. TankSmith's own systems use CDL/CDLF vertical multistage centrifugal booster pumps rated from 0.37 kW to 200 kW in stainless steel 304, sized per building and paired with VFD duplex control panels rather than a single fixed-speed pump and a charge tank. This is a different design approach to the same problem: instead of buffering pump cycles with a tank, a VFD panel varies pump speed to match demand directly, which changes, and in most cases removes, the need for the charge tank in the first place. The next section explains how that works and when a charge tank is still specified alongside VFD control rather than instead of it.

How VFD Duplex Control Reduces Reliance on a Large Charge Tank

A VFD (variable frequency drive) duplex control panel ramps pump speed up and down based on live pressure feedback instead of switching a fixed-speed pump fully on or off. Because the pump only runs as fast as current demand requires, the motor is not cycling on and off the way a fixed-speed pump does, which is the specific wear pattern a charge tank exists to prevent. TankSmith's VFD duplex panels use Inovance VFDs in an IP54 enclosure, take pressure feedback directly from the line, and auto-alternate between two pumps so that run hours, and wear, are shared evenly across both units. This does not mean a charge tank becomes unnecessary in every design: some specifications still call for a small buffer vessel alongside VFD control for redundancy during a power interruption or a very short demand spike before the drive ramps up. What changes is the sizing logic: with VFD control already handling the start-stop problem, the charge tank's role shifts from primary cycle protection to a smaller supporting buffer, which is a different (and usually smaller) sizing exercise than specifying a stand-alone charge tank for a fixed-speed pump. TankSmith's contract covers the pump and control panel side of that design decision; the charge tank or pressure vessel itself, if the design still calls for one, is sourced separately as a pressure-vessel fabrication item.

TankSmith's Turnkey Alternative: Tank, Pump, and Control Under One Contract

TankSmith is a Philippines-based turnkey installer for modular water tank systems and matching pressure booster pump systems, supplying, installing, and commissioning both the storage side and the pressure side under one contract instead of splitting the work between a tank supplier, a pump supplier, and an electrical contractor. The tank side covers FRP, GRP/SMC, hot-dip galvanized steel, and stainless steel 304/316 bolted panel tanks from 1,000 to 500,000 liters, carrying a 3-year panel warranty and a 20 to 25 year design life. The pump side covers CDL/CDLF vertical multistage centrifugal booster pumps from 0.37 kW to 200 kW in stainless steel 304, paired with Inovance VFD duplex control panels (IP54, pressure feedback, auto-alternation). A typical 20 KL to 500 KL installation runs 5 to 14 days depending on capacity and how ready the civil works are on site. For a project that specified a 100-liter charge tank as part of a booster pump cut sheet, TankSmith's relevant scope is the storage tank and the booster pump and control side of that same water system, engineered and installed as one package rather than as separate line items from separate suppliers.

Who Specifies These Systems in the Philippines

Charge tanks and booster pump systems built to this kind of spec sheet typically get specified by mechanical engineers and procurement teams working on commercial and institutional buildings where water pressure has to reach upper floors reliably: hotels and resorts retrofitting rooftop tanks with booster pump integration, condominiums and high-rise buildings with tight rooftop access, hospitals and clinics that need redundancy and a code-compliant fire reserve, and food manufacturing sites that need WRAS-certified potable water handling. Commercial laundries also specify pump and buffer sizing against linen throughput per day rather than building height, since their peak demand is driven by wash cycles instead of floor count. Warehouses and manufacturing plants add a similar booster pump and buffer discussion when the specification includes a fire water reserve alongside process water. TankSmith's installs run nationwide across the Philippines, including NCR, Luzon, Visayas, and Mindanao, and cover PEZA and freeport zones such as SBMA, Clark, Cavite, and Batangas, where civil readiness and site access schedules often drive the installation timeline as much as tank capacity does.

What to Verify Before You Buy a Charge Tank or Booster System

Before ordering a charge tank, pressure vessel, or a full booster pump system, verify the certifications on paper rather than taking a spec sheet's word for it: ask for WRAS certification if the vessel or tank will hold potable water up to 65 degrees Celsius, confirm any liner material is NSF-compliant, and check that the manufacturer or installer operates under an ISO 9001 quality management system. For welded pressure vessels specifically, ask whether the unit and its gusset weldments have been tested (TUV SUD testing is one recognized standard to ask for). Also confirm the warranty terms and design life in writing: TankSmith's own modular tank systems carry a 3-year panel warranty with a 20 to 25 year design life, and that kind of explicit figure, not a vague durable or heavy duty claim, is what a warranty document should state. Finally, if the project scope includes both a tank and a booster pump, ask whether the supplier is responsible for both mechanical and electrical commissioning under one contract, since split responsibility between a tank vendor and a separate pump and panel installer is a common source of finger-pointing when a system underperforms after installation.

Frequently Asked Questions

A charge tank is a small buffer vessel on the suction or discharge side of a booster pump that absorbs short bursts of flow so a fixed-speed pump does not switch on and off every time demand changes slightly. This protects the pump motor from short-cycling, which wears out motor windings and contactors faster than continuous running. Charge tanks are most often specified alongside fixed-speed pumps; systems using VFD duplex control, which varies pump speed against live pressure feedback instead of switching the pump fully on and off, typically need a smaller buffer or none at all, since the drive itself absorbs the demand swings the charge tank would otherwise handle.

A gusset weldment is the triangular steel plate welded between a tank's support legs and its shell. On a small charge tank raised off the floor on welded legs, the gusset stops the legs from flexing sideways under the tank's weight and under the vibration from pump start-stop cycles. Without a gusset, the legs would rely on the leg-to-shell weld alone to carry that load, which is a weaker joint under repeated vibration. "Legs and gusset weldment" is standard phrasing on fabrication drawings and pump manufacturer cut sheets, describing the support structure rather than the tank body itself.

No. TankSmith's modular tank systems start at 1,000 liters, sized up to 500,000 liters, built as bolted panel tanks in FRP, GRP, hot-dip galvanized steel, or stainless steel 304/316. A 100-liter charge tank is a small, single-piece welded pressure vessel used to buffer pump cycles, an entirely different product category built for a different job. TankSmith does not fabricate vessels at that size or in that welded, leg-mounted format. What TankSmith does supply is the storage tank and the booster pump and VFD control system on the same water line where a charge tank might otherwise be specified.

No. TankSmith's product range is modular bolted panel water tanks from 1,000 to 500,000 liters, paired with CDL/CDLF booster pumps and VFD duplex control panels. TankSmith does not fabricate small welded pressure vessels such as a 100-liter charge tank. If a project specification calls for a charge tank at that size, that is a pressure-vessel fabrication scope, separate from what TankSmith supplies. TankSmith's relevant contribution to that same water system is the storage tank and the booster pump and control side, installed and commissioned together under one contract.

A typical TankSmith installation runs 5 to 14 days for tank systems between 20 KL and 500 KL, depending on the capacity ordered and how ready the site's civil works (foundation, tank pad, access) are before the crew arrives. This covers supply, installation, and commissioning of the storage tank and, where included in the scope, the paired booster pump and VFD duplex control panel, under one contract rather than as separate mechanical and electrical work orders. Installations run nationwide across NCR, Luzon, Visayas, Mindanao, and PEZA/freeport zones such as SBMA, Clark, Cavite, and Batangas.

Ask for WRAS certification if the tank or vessel will hold potable water up to 65 degrees Celsius, confirm any liner material is NSF-compliant, and verify the manufacturer operates under an ISO 9001 quality management system. For welded components such as a charge tank's gusset weldments, ask whether the unit has been tested (TUV SUD testing is one recognized standard). Get the warranty and design life in writing rather than relying on verbal claims: TankSmith's modular tank systems carry a 3-year panel warranty and a 20 to 25 year design life, stated explicitly rather than described as heavy duty or long lasting.

Found this useful? Add TankSmith as a Preferred Source on Google so our tank sizing guides show up first next time you search.

Get a Quote

Send your capacity, site conditions, and timeline for a sized quotation.

Request a Quote

Browse more buying guides.