How to Size, Coat, and Design the Skid for a Chiller Makeup Water Tank

TankSmith sizes, coats, and installs makeup water tanks and booster pump skids for the open condenser-water loop on water-cooled packaged chiller plants, plus commercial process loops, nationwide in the Philippines. This makeup water replaces evaporation, blowdown, and drift losses from the cooling tower loop, not the chiller's sealed chilled-water circuit that runs to the building; air-cooled packaged chillers have no evaporative loop, so any makeup water on their closed loop only replaces minor leak losses. Tanks range from 1,000 to 500,000 liters in FRP, GRP, HDG steel, or stainless steel 304/316, each paired with a VFD-controlled pump skid built for the loop's pressure and flow needs. Installation runs 5 to 14 days for 20 KL to 500 KL systems, with tank and pump supplied, installed, and commissioned under one contract.

How to Size a Makeup Water Tank for a Packaged Chiller Loop

Makeup water tanks for packaged chillers and commercial process loops replace water lost to evaporation, blowdown, and drift in the open condenser-water loop that feeds a cooling tower, not the chiller's sealed chilled-water circuit that runs to the building; that closed loop only needs makeup water to replace minor leak losses, since it does not evaporate. On a water-cooled packaged chiller plant, the right tank size depends on the cooling tower loop's holdup volume, its evaporation and blowdown rate, and how much standby buffer the facility wants before a refill alarm triggers. Air-cooled packaged chillers have no cooling tower and no evaporative loop, so they have no cooling-tower makeup water need at all; any makeup water on their closed loop covers leak losses only. TankSmith's modular panel tanks are available from 1,000 liters up to 500,000 liters, built in FRP, GRP, HDG steel, or stainless steel bolted panels, so the tank can be matched to loops ranging from a single packaged rooftop chiller to a multi-chiller plant serving a warehouse or manufacturing facility. Because the panels bolt together on site, the same tank family scales up or down without changing the design approach: a small process loop and a large industrial plant use the same modular system, just more or fewer panels. For facilities inside PEZA, SBMA, Clark, Cavite, or Batangas industrial estates, this modularity also simplifies the civil works and crane access that bigger single-piece tanks would need. TankSmith's engineering team sizes the tank against the actual loop volume, makeup rate, and buffer time the facility specifies, rather than a one-size formula, since chiller plant configurations vary by tonnage, piping run length, and how the loop is isolated. Get in touch with specific loop volume and makeup rate figures for an exact capacity recommendation.

Choosing the Right Tank Material and Finish for Process Water

The tank material functions as the corrosion protection system for a makeup water tank, so coating and material choice are really the same decision. FRP and GRP panels do not need a separate coating: the resin and gelcoat finish is the corrosion barrier, and TankSmith's FRP panels carry WRAS certification for potable water contact up to 65C plus NSF-compliant liners where the loop touches potable-grade water. HDG steel panels use hot-dip galvanizing itself as the protective zinc coating, a lower-cost option where the water chemistry and application allow it. Stainless steel 304 or 316 panels need no coating at all, since the alloy resists corrosion on its own, and are a common choice where process water chemistry is more aggressive or where the facility specifies stainless for wash-down or hygiene reasons. All panel materials come from an ISO 9001 certified partner factory and are TUV SUD tested, and TankSmith backs the FRP panels with a 3-year warranty against a 20 to 25 year design life. Because the material decision also sets maintenance needs (HDG panels should be inspected for coating wear over time, while FRP and stainless do not need this), TankSmith's quote includes a material recommendation based on the water chemistry, budget, and design life the facility is targeting for the chiller loop, rather than a default material applied to every job.

Designing the Booster Pump Skid: VFD Control and Redundancy

The booster pump skid is the mechanical and electrical assembly that moves makeup water from the tank into the chiller loop, and TankSmith builds it to match the tank rather than quoting pump and tank as two separate purchases. The pump side uses CDL/CDLF series vertical multistage centrifugal pumps in stainless steel 304, available from 0.37 kW up to 200 kW, sized to the loop's required flow and head. Each skid pairs the pump with a VFD duplex control panel rated IP54, which uses pressure feedback to vary pump speed instead of running at a fixed speed, and auto-alternation to rotate the duty pump between two units so one pump is not carrying the full duty cycle continuously. For a chiller makeup application, this matters because makeup demand is intermittent and the loop's pressure requirement is usually narrow, so a VFD-controlled skid avoids the pressure spikes and energy waste of a fixed-speed pump cycling on and off. Because TankSmith supplies the tank, the pump, and the control panel under one contract, the skid's suction piping, tank nozzle placement, and electrical tie-in are designed together during the same engineering pass instead of being reconciled on site by separate mechanical and electrical contractors. That single-team accountability is also what TankSmith commissions and signs off on at handover.

Installation and Commissioning Timeline

Installation for a makeup water tank and pump skid runs 5 to 14 days from mobilization to commissioning, with the exact duration set by tank capacity and how ready the site's civil works are when the crew arrives. A 20 KL system for a single packaged chiller sits at the shorter end of that range, while a 500 KL system for a multi-chiller plant or a larger process facility needs the full window. Because the panels are modular and bolt together, most of the schedule risk is in civil readiness (the slab, access for panel delivery, and the nearby electrical tie-in point) rather than in the tank assembly itself, so TankSmith confirms civil readiness before locking the installation date. Commissioning covers both sides of the system: the tank is tested for leaks and water quality before handover, and the pump skid is tested under load with the VFD duplex panel's pressure feedback and auto-alternation logic verified on site, not just on paper. Because one team supplies, installs, and commissions both the tank and the pump skid, there is a single point of accountability if something in the handover does not perform as sized, rather than a tank contractor and a pump contractor each pointing at the other's scope.

Where These Systems Get Installed in the Philippines

These systems serve facilities with packaged chillers or commercial process cooling loops across the Philippines, including warehouse and manufacturing sites where the chiller supports a process water loop rather than just comfort cooling, and facilities inside PEZA, SBMA, Clark, Cavite, and Batangas industrial estates where a chiller plant is part of the production line. TankSmith installs nationwide, covering NCR, the rest of Luzon, Visayas, and Mindanao, so a facility outside Metro Manila gets the same tank and pump skid design rather than a scaled-down regional option. Food manufacturing sites with chiller-fed process loops can specify WRAS-certified panels and NSF-compliant liners where the loop has any potable water contact point. Because the tank and pump skid are sized to the specific loop rather than sold as a fixed package, the same modular panel system and CDL/CDLF pump range covers a single rooftop packaged chiller and a multi-chiller industrial plant, with the design scaling by panel count and pump kW rather than by a different product line.

Frequently Asked Questions

Tank size depends on which loop you're sizing for. On a water-cooled packaged chiller plant, makeup water replaces evaporation, blowdown, and drift losses from the open condenser-water loop that feeds the cooling tower, not the chiller's sealed chilled-water circuit, so sizing is based on the cooling tower loop's holdup volume, its evaporation and blowdown rate, and the standby buffer wanted before refill. Air-cooled packaged chillers have no cooling tower and no evaporative loop, so any makeup water on their closed loop only needs to cover minor leak losses. TankSmith's modular panel tanks range from 1,000 to 500,000 liters in FRP, GRP, HDG steel, or stainless steel, so the same system scales from a single packaged rooftop chiller to a multi-chiller industrial plant. Rather than apply a generic formula, TankSmith's engineering team sizes the tank against the facility's actual loop volume and makeup rate. Share those figures when requesting a quote for an exact capacity recommendation.

For TankSmith's tanks, the material is the coating decision. FRP and GRP panels use a resin and gelcoat finish as the corrosion barrier and need no separate coating. HDG steel panels are protected by the zinc layer applied during hot-dip galvanizing, which is itself a coating process. Stainless steel 304 or 316 panels resist corrosion on their own and need no coating at all. All panel materials come from an ISO 9001 certified partner factory and are TUV SUD tested, with FRP panels carrying a 3-year warranty against a 20 to 25 year design life.

TankSmith's pump skid pairs a CDL/CDLF series vertical multistage centrifugal pump, available from 0.37 kW to 200 kW in stainless steel 304, with a VFD duplex control panel rated IP54. The VFD varies pump speed using pressure feedback instead of running at a fixed speed, and auto-alternation rotates duty between two pumps so neither unit carries the full cycle continuously. Because TankSmith supplies the tank, pump, and control panel under one contract, the skid's piping, tank nozzle placement, and electrical tie-in are engineered together rather than reconciled on site between separate contractors.

Installation runs 5 to 14 days from mobilization to commissioning, depending on tank capacity and how ready the site's civil works are. A 20 KL system for a single packaged chiller is on the shorter end, while a 500 KL system for a multi-chiller plant needs the full window. Commissioning covers both the tank (leak and water quality testing) and the pump skid (load testing with the VFD's pressure feedback and auto-alternation verified on site). TankSmith confirms civil readiness before locking the installation date.

Yes. TankSmith installs nationwide, covering NCR, the rest of Luzon, Visayas, and Mindanao, including facilities inside PEZA, SBMA, Clark, Cavite, and Batangas industrial estates. A facility outside Metro Manila gets the same modular tank system and CDL/CDLF pump skid design as one inside it, sized to the specific chiller loop rather than a reduced regional package.

Yes. TankSmith's FRP panels carry WRAS certification for potable water contact up to 65C, and NSF-compliant liners are available where the loop touches potable-grade water. This is relevant for food manufacturing sites and other facilities where the makeup water tank feeds both the process loop and a point with potable contact. Specify this requirement when requesting a quote so the correct liner and panel certification are included in the design.

Get a Quote

Send your capacity, site conditions, and timeline for a sized quotation.