Modular Water Tank Installation for SBMA and Subic Bay Freeport Locators
TankSmith is a Philippines-based turnkey modular water tank installer, and SBMA locators inside Subic Bay Freeport sit within our defined industrial estate coverage alongside Clark, Cavite and Batangas. Work inside a freeport is not the same as work on an open commercial site: deliveries pass through controlled gates, contractor access is scheduled, and the water storage design usually has to sit in the locator's own compliance file. Our scope is supply, install and commissioning under one contract, so one team is accountable for the tank, the connections and the pressure side rather than three suppliers pointing at each other when commissioning day arrives. Freeport-compliant documentation is prepared for SBMA, Clark and PEZA locator projects. Modular bolted panel construction, the same system behind our sectional water tank systems in the Philippines, is what makes this practical inside existing freeport buildings. Panels arrive flat and are assembled in position, so a 100 KL tank can be built inside a plant room, a mezzanine or a rooftop plinth without breaking a wall or craning in a one-piece vessel. That matters for tight-access retrofits where a welded steel tank or a moulded one-piece tank will not physically pass the door. Coverage is nationwide across NCR, Luzon, Visayas and Mindanao, so a Subic locator gets the same specification, install and commissioning process as a Metro Manila project. TankSmith was founded in 2024 and sources panels from ISO 9001 certified partner factories.
Panel Materials We Install: FRP, GRP, HDG Steel and Stainless Steel
We install four bolted panel material families, and the right one depends on what the water is for and where the tank sits. FRP (fiberglass reinforced plastic) panels are the general-purpose choice for potable and process storage: light per panel, non-corroding, and easy to carry up a stair core on a retrofit. GRP and FRP bolted panel tanks serve the same duty with a moulded panel format, including SMC (sheet moulded compound). The HDG steel modular water tank range (hot-dip galvanized) suits fire reserve and non-potable process duties where structural strength per peso is the priority and the tank sits at grade. The stainless steel modular water tank range in 304 and 316 is specified where the water chemistry, the temperature or the client's own hygiene standard rules out anything else, with 316 being the choice where chlorides are a concern. For potable duty we can specify WRAS-certified water tank panels rated for potable water up to 65C, and NSF-compliant liners where the locator's standard calls for a liner system. Panels are TUV SUD tested and come from ISO 9001 certified partner factories. For an SBMA locator, the practical selection questions are usually access route, whether the water is potable or fire reserve, and whether the tank is indoors, on a roof, or on an outdoor slab. We specify against those three answers rather than pushing one material for every site.
Capacity: 1,000 Liters to 500,000 Liters per Tank System
Our modular tank systems run from 1,000 liters up to 500,000 liters per system, which covers the full spread of what a Subic Bay Freeport locator normally needs. At the small end, a 1,000 to 10,000 liter tank handles a break tank for a booster set, a day tank for a process line, or potable buffer storage for an office block. In the middle, 20 KL to 100 KL is the common band for warehouse fire reserve, a commercial laundry, a canteen and washroom load across a shift, or a hotel and resort rooftop retrofit. At the top, 200 KL to 500 KL suits manufacturing process water, a food plant potable reserve, or a hospital-grade requirement where redundancy and a code-compliant fire reserve have to be held in separate compartments. Because panels are bolted, capacity is set by panel array rather than by a fixed catalogue vessel, so a tank can be shaped to the footprint you actually have: long and low along a wall, or tall inside a plant room with headroom. That also means an existing modular tank can be extended later with replacement or expansion panels instead of being replaced. Give us the daily demand, the required reserve hours, the fire reserve requirement and the available footprint, and the capacity and array follow from those numbers.
Booster Pumps and VFD Controls Installed With the Tank, One Contract
Storing water is only half the job. Most SBMA locator problems that get described as a tank problem are actually a pressure problem: the tank fills, but the far end of the plant, the top floor, or the wash bay never sees usable pressure. TankSmith installs the pressure side with the storage side under a single contract. Pumps are vertical multistage centrifugal booster pumps (CDL and CDLF series) in SS304, from 0.37 kW up to 200 kW, sized to the flow and head the building actually needs rather than to the biggest pump on the shelf; the full pressure booster pump system range is specified there. Control is by VFD duplex control panel using Inovance drives, rated IP54, running pressure feedback so the drive holds setpoint as demand swings, with automatic alternation between the two pumps so duty hours are shared and neither unit becomes the only one that has ever run. Duplex configuration also means a single pump fault does not take the building's water pressure with it, which is the reason hospitals, clinics and hotels specify it. Mechanical work, electrical work and commissioning all sit in the same scope, so there is no gap between the tank contractor finishing and an electrical contractor being booked. One team specifies it, installs it, commissions it against measured pressure, and hands it over.
Installation Timeline: 5 to 14 Days for 20 KL to 500 KL
Typical installation runs 5 to 14 days for 20 KL to 500 KL systems, per the installation timeline for modular tanks, and where a given project lands in that band depends on two things: capacity, and how ready the civil works are. Capacity drives panel count and assembly time. Civil readiness drives everything else, because a bolted panel tank needs a level, correctly loaded base or steel support frame before the first panel goes up. If the slab, plinth or frame is cured and surveyed when we arrive, the assembly runs continuously. If it is not, the tank crew waits, and that wait is the single most common reason a schedule slips. For SBMA locators there is a third factor to plan around: gate access and delivery scheduling inside the freeport, which is why we agree the delivery window and the working hours before mobilisation rather than after. Sequence on site is base check, panel assembly and bolting, internal bracing, seal and leak test, pipework tie-in, then pump and control panel installation and commissioning against measured pressure. Bolted modular construction is what keeps the window this tight, because panels are carried in and assembled in place rather than fabricated on site. Design life is 20 to 25 years, so the days spent getting the base and the leak test right are the cheapest days in the project.
Certifications, Warranty and Design Life
For procurement files and locator compliance reviews, here is exactly what is available and what is not. Panels are sourced from partner factories operating an ISO 9001 quality management system and are TUV SUD tested. For potable duty, WRAS-certified panels rated for potable water up to 65C can be specified, and NSF-compliant liners are available where a liner system is required. FRP panels carry a 3-year panel warranty, and system design life is 20 to 25 years. Booster pumps are SS304 wetted-part construction, and control panels are IP54 rated. We are a supplier and installer, not a manufacturer: panels come from ISO 9001 certified partner factories, and we say so plainly because a locator compliance file should reflect the actual chain of supply. What we do own is the integration: specification, installation, and commissioning of both the storage and the pressure side under one contract, which is where accountability usually gets lost when a tank supplier, a pump supplier and an electrician are engaged separately. If your SBMA facility requires specific certificate copies or test documentation in the submittal, ask for them with the enquiry and they can be included with the quotation package rather than chased after award.
Verticals We Serve Inside Subic and Nearby Industrial Estates
The locator mix inside Subic Bay Freeport and the surrounding estates maps closely to the verticals we size systems for. Warehouse water tank and fire reserve systems typically pair fire reserve with process water, often in one tank with compartments. Food manufacturing needs WRAS-compliant potable storage and a documented material specification. Commercial laundry is sized against kg per day of linen throughput rather than headcount, because throughput is what actually sets hot and cold water demand. Hotels and resorts are usually rooftop retrofits where access dictates the panel material and the booster pump has to be integrated into an existing riser. Hospitals and clinics need redundancy on the pressure side and a code-compliant fire reserve that cannot be drawn down by daily demand. Condominiums and high-rise buildings are tight-access rooftop jobs where a bolted panel tank goes in through a stair core. Beyond Subic, the same specification process applies to Clark, Cavite and Batangas industrial estates and to PEZA-registered locators, with nationwide coverage across NCR, Luzon, Visayas and Mindanao. If your facility type is on that list, the sizing conversation starts from your demand numbers and your footprint, not from a catalogue page.
Frequently Asked Questions
Yes. SBMA and Subic Bay Freeport locators are within our coverage, along with Clark, Cavite and Batangas industrial estates and PEZA-registered sites, on top of nationwide Philippines coverage across NCR, Luzon, Visayas and Mindanao. Scope is turnkey: supply, install and commission the modular tank and, where required, the matching pressure booster pump system under one contract. Freeport-compliant documentation is prepared for SBMA, Clark and PEZA locator projects.
Modular tank systems run from 1,000 liters to 500,000 liters per system. Break tanks and day tanks sit in the 1,000 to 10,000 liter range, warehouse fire reserve and commercial laundry commonly land between 20 KL and 100 KL, and manufacturing process water or hospital requirements typically fall in the 200 KL to 500 KL band. Because panels are bolted, the array is shaped to your actual footprint and capacity can be extended later with expansion panels.
Typical installation is 5 to 14 days for systems between 20 KL and 500 KL, depending on capacity and civil readiness. Capacity sets panel count and assembly time. The base slab, plinth or steel support frame must be level and ready before the first panel goes up, and waiting on civil works is the most common cause of a slipped schedule. Sequence is base check, panel assembly, internal bracing, seal and leak test, pipework tie-in, then pump and control installation with commissioning.
It depends on duty, location and access. FRP and GRP or SMC bolted panels are the general-purpose choice for potable and process storage and suit stair-core retrofits. HDG steel suits fire reserve and non-potable process duty at grade. Stainless steel 304 or 316 is specified where water chemistry, temperature or an in-house hygiene standard rules out the alternatives, with 316 where chlorides are a concern. For potable duty, WRAS-certified panels rated to 65C and NSF-compliant liners can be specified.
Yes. Vertical multistage centrifugal booster pumps (CDL and CDLF series, SS304) are available from 0.37 kW to 200 kW, controlled by VFD duplex panels using Inovance drives, IP54 rated, with pressure feedback and automatic pump alternation so duty hours are shared. Duplex means one pump fault does not take building pressure down with it. Mechanical work, electrical work and commissioning sit in a single contract, so there is no handover gap between separate suppliers.
Panels come from partner factories operating an ISO 9001 quality management system and are TUV SUD tested. WRAS-certified panels rated for potable water up to 65C can be specified for potable duty, and NSF-compliant liners are available where a liner system is required. FRP panels carry a 3-year panel warranty and system design life is 20 to 25 years. We are a supplier and installer rather than a manufacturer. Request specific certificate copies with your enquiry and they can be included with the quotation package.