A Ø2200mm FRP foot component is the bolted base ring section that lets an existing TankSmith modular tank of that diameter gain height, add capacity, or replace a worn base course without replacing the full tank. It ships to the same WRAS-certified FRP specification as the original installation, backed by TankSmith's 3-year panel warranty, and fits anywhere in TankSmith's 1,000 to 500,000 liter modular range.
What the Ø2200mm FRP Foot Component Includes
The Ø2200mm FRP foot component is a bolted base ring panel set sized to match the lower course of a TankSmith modular tank at that diameter. It is supplied in the same FRP (fiberglass reinforced plastic) bolted panel material used across TankSmith's full modular range, from 1,000 liters to 500,000 liters, so a Ø2200mm tank already in service can gain a new base course without disturbing the panels above it. The component arrives pre-cut and pre-drilled to the bolt pattern of the existing ring, with gaskets and fastening hardware included for a direct bolt-up installation. Because the panels come from an ISO 9001 certified partner factory and are WRAS-certified for potable water up to 65°C, the replacement or extension course meets the same specification as the original installation rather than introducing a mismatched material partway up the tank wall. This matters most in two situations: a tank owner who needs more stored volume without a full teardown, and a tank owner whose lowest course shows wear from ground contact or settling and needs that course replaced before the rest of the structure is affected. In both cases the foot component is engineered to the original Ø2200mm ring geometry, so it bolts into place without requiring a full re-survey of the upper courses.
When to Use a Foot Extension Instead of a Full Tank Replacement
Three situations call for a foot extension rather than a new tank. First, capacity upgrade: adding a base course under an existing Ø2200mm tank increases total stored volume while keeping the added course inside TankSmith's standard 1,000 liter to 500,000 liter modular range. Second, base course wear: the lowest ring of any ground-mounted modular tank carries the most load and is the first to show wear from settling, moisture, or ground contact, and replacing only that course is faster and less costly than dismantling the full structure. Third, phased capacity planning: a site that installed a smaller Ø2200mm tank anticipating future demand can add a foot course later instead of committing to larger capacity upfront. In all three cases, the work is handled under TankSmith's turnkey model: supply, install, and commission happen under one contract rather than splitting the component purchase from the labor, keeping a single point of accountability for the finished extension. Typical turnkey installs for TankSmith's modular systems run 5 to 14 days depending on capacity and civil readiness, and a single-course foot extension on an existing tank falls at the shorter end of that range since the upper structure is already in place and does not need to be re-engineered.
Material and Certification Specs
The Ø2200mm foot component is FRP (fiberglass reinforced plastic), the same bolted panel material TankSmith uses alongside its GRP/SMC, HDG steel, and stainless steel 304/316 modular lines, specified here in FRP to match a Ø2200mm tank originally built in that material. Panels are WRAS-certified for potable water contact up to 65°C and paired with NSF-compliant liners where a liner is part of the original build, so a facility using the tank for drinking water or process water does not lose certification partway up the structure by introducing an unverified material. The panels are produced under an ISO 9001 certified manufacturer quality management system and are TUV SUD tested before they ship to the Philippines for installation. TankSmith backs the foot component with the same 3-year FRP panel warranty applied to new tank builds, and the component is designed to the same 20 to 25 year design life as the rest of the modular system, so adding or replacing a base course does not shorten the expected service life of the tank as a whole. These are the same specifications TankSmith states for full tank builds, carried through to the component level rather than relaxed for a smaller order.
Installation Process and Timeline
Installation of a Ø2200mm foot component follows the same turnkey process TankSmith uses for full tank builds: a site visit confirms the existing ring's bolt pattern and foundation condition, the matching FRP panel set is supplied, and TankSmith's own crew installs and commissions the course rather than handing the job to a third party. Mechanical bolting is the only structural work required on a straightforward extension or replacement, since the component is pre-matched to the existing Ø2200mm ring; no separate electrical scope applies unless the extension is installed alongside a booster pump upgrade, in which case TankSmith's VFD duplex control panels and CDL/CDLF series pumps can be commissioned in the same visit. A single-course extension or base replacement on an existing tank typically completes within TankSmith's standard 5 to 14 day install window, with the shorter end of that range applying when the tank is already in service and the civil pad is sound. TankSmith installs nationwide, including NCR, Luzon, Visayas, and Mindanao, and supports PEZA, SBMA, and Clark freeport sites where site-access procedures can add lead time to scheduling. Scheduling the foot component alongside a routine inspection, rather than only after a failure is visible, keeps the swap inside the shorter end of the install window.
Compatible Verticals and Applications
A Ø2200mm tank sized for a foot extension or base replacement shows up across the same verticals TankSmith serves with full modular systems. Commercial laundry operations size tanks against kg/day linen throughput and often need added capacity as volume grows, making a base course extension a lower-disruption way to scale than a second tank. Hotels and resorts running rooftop or ground-mounted tanks for booster pump integration use the same component to add reserve capacity ahead of occupancy growth. Hospitals and clinics maintaining code-compliant fire reserve and redundancy capacity rely on base-course replacement to keep an aging tank in service without a gap in fire-water availability during the swap. Food manufacturing sites using WRAS-compliant potable water storage need the replacement course to carry the same certification as the rest of the tank, which the FRP foot component does. Warehouses and manufacturing facilities maintaining fire reserve or process water, and condominiums or high-rises with tight rooftop access, both benefit from a component-level fix that avoids craning in a full replacement tank. The same applies to installations inside SBMA, Clark, Cavite, and Batangas industrial estates, where TankSmith already installs and services full modular systems under PEZA and freeport site requirements.
Frequently Asked Questions
A Ø2200mm FRP foot component is a bolted base ring panel set that fits the lowest course of a TankSmith modular tank at that diameter. It lets an existing tank gain a new base course, which either adds stored capacity within TankSmith's 1,000 liter to 500,000 liter modular range or replaces a worn lowest course without dismantling the panels above it. The component is made from the same FRP material as the rest of the tank, bolts to the existing ring pattern, and is backed by TankSmith's 3-year panel warranty. It is supplied and installed under TankSmith's turnkey model, so the same team handles supply, installation, and commissioning.
Yes. Adding a Ø2200mm foot course under an existing tank is a standard way to increase stored capacity while keeping the added course inside TankSmith's standard 1,000 liter to 500,000 liter modular design envelope. Because the component bolts into the existing ring pattern, the panels above it stay in place and the upper structure does not need to be re-surveyed or re-engineered. This is typically faster and less disruptive than installing a second tank or replacing the full structure, and it still carries the same WRAS certification and 3-year warranty as a new build.
The Ø2200mm foot component is engineered to match the bolted panel specification TankSmith uses on its own FRP tank builds. Fit on a tank installed by a different supplier depends on that tank's exact ring diameter, bolt pattern, and panel thickness, which TankSmith cannot confirm without a site assessment. Before ordering, TankSmith recommends a site visit to measure the existing ring and confirm compatibility rather than assuming a generic drop-in fit, since modular tank panel specifications vary between manufacturers even at the same stated diameter.
The component uses the same certifications TankSmith applies across its FRP tank line: WRAS-certified panels for potable water contact up to 65°C, NSF-compliant liners where a liner is part of the build, and panels produced under an ISO 9001 certified manufacturer quality management system with TUV SUD testing before shipment to the Philippines. It carries TankSmith's standard 3-year FRP panel warranty and is designed to the same 20 to 25 year design life as the rest of the modular tank, so adding or replacing this course does not reduce the certified status or expected service life of the tank.
A single-course foot extension or base replacement on an existing Ø2200mm tank typically falls at the shorter end of TankSmith's standard 5 to 14 day turnkey install window, since the upper tank structure is already in place and only the base course needs matching and bolting. TankSmith installs nationwide across NCR, Luzon, Visayas, and Mindanao, including PEZA, SBMA, and Clark freeport sites, where freeport site-access procedures can add lead time to scheduling. The exact timeline depends on site readiness and civil pad condition, confirmed during the pre-install site visit.
Browse more configurations in the water tank systems directory.
Related Pages
- 1,000 Gallon FRP Degasifier Tank Supplier and Installer in the Philippines
- FRP Bolted Water Tank Systems in the Philippines: Supply, Install, Commission
- FRP Bolted Water Tank Systems in the Philippines: Supply, Install, Commission
- Reinforced Plastic (FRP) Storage Tank Supplier in the Philippines
- FRP Sectional Water Tank Price List Philippines: Capacity Bands and Cost Factors
- FRP Tank Installation in the Philippines: Process and Timeline Explained
Found this useful? Add TankSmith as a Preferred Source on Google so our tank sizing guides show up first next time you search.